Topic 1: Fundamentals of implementation planning
- Working through the results of the design, approval and fiber planning, taking into account all technical
and legal requirements for pipeline construction with clear routing - Evaluation of approval letters from public authorities and utility companies (gas, water, electricity, district heating, etc.)
- Sensible use and combination of network elements
Topic 2: Preparation of the implementation planning
- Creation of the schedule (client) and development of the draft construction schedule (contractor)
based on the feedback from the public interest bodies (TÖB) - Detailed elaboration of the instructions for civil engineering, blowing in and cable installation incl. Overview of the public authorities involved (contact details)
- Preparation of detailed construction execution plans (e.g. route plans, pipe plans), incl. Documentation templates (e.g. line routes and line technical acceptance protocols) from the client and existing line routes
- Preparation of cable installation plans (blow-in, splice and, if necessary, patch plans)
- Provision of stakeout plans for the route layout
- Mass determination for material and services to be performed
- Planning of the confirmed system locations (POP, GF- KVz and cable ducts)
Topic 3: Basics for the structure and filling of service specifications
- Types of contract bases (BGB/VOB/VOL)
- Identify types of tender for subsequent award
- freehand
- limited
- European
- Structure and content of the bill of quantities
- Absolutely necessary contents
- Content that may/should not be included
- Acceptance of the mass determination
- Sources for service descriptions
Topic 4: Evaluation and assessment of learning status and ability
- Summary of the contents of topics 1 to 4
- Assessment of learning status and ability